California is a general construction launch with a filing math problem and an operating problem, and they are not the same size. Day-one state cash we can confirm is $70. Known first-year state charges, including that filing, come to $890. The recurring figure on the state schedule is $20 (statement of information). Set against a $60,000 planning midpoint, the day-one filing is 0.1% of the operating sketch.
California's $70 articles are the cheap line. The $800 Franchise Tax Board LLC tax is due in the first year, the $20 Statement of Information is due within 90 days, and total California income over $250,000 adds a separate LLC fee. Most licensed professions cannot operate as an ordinary LLC.
The CSLB licenses the classification you will actually bid — B for general building, or a specialty class. A qualifier, a bond, and workers' compensation come first. The $800 tax is due even while you are still studying for the exam.
A one-crew remodeler can start with a truck and a license. The number jumps when the work requires a bond large enough for commercial bids or a payroll that cannot wait on the next draw.
The loan line in this model is $100,000. Construction financing is a float between supplier terms and owner draws. A $100,000 line is a one-crew materials and payroll cushion, not a speculative build. General contracting licenses are state or local, often with a qualifier, an exam, and a bond. Workers' compensation starts when you hire. The LLC filing does not satisfy the contractors board.
Industry figures are planning midpoints for a lean, owner-operated launch in 2026 dollars. They are not quotes, loan approvals, or a survey of what founders spend. Each stack adds a vehicle or deposit, tools or equipment, a first insurance premium, license cash, and one to two months of operating cash. It excludes the state filing fee, the owner's living expenses, real estate purchases, and buying an existing practice or book of business.
What the operating midpoint is made of
- Truck and basic job-site tools$20,000
- Insurance and bond capacity$10,000
- License, exams, and local registration$3,000
- Estimating software and a part-time bookkeeper$2,000
- Materials and payroll float on the first jobs$25,000